용접식 리프팅 D-링은 기계에 용접되도록 설계된 정격 하중 리프팅 지점입니다., 강철 구조, 리프팅 프레임, 해양 장비, 운송 프레임, 및 기타 하중 지지 구성 요소.

일반적으로, the assembly consists of a forged lifting ring and a weld-on mounting block. 디자인에 따라, the lifting ring may pivot within one plane or accommodate loads from several specified directions.
들어 올리는 동안, the load transfer through the following path:
슬링 / 걸쇠 / Hook → D-Ring → Weld-On Block → Weld → Supporting Structure
하지만, WLL represents only one part of the lifting system. 그러므로, engineers and buyers should also consider load direction, 슬링 각도, supporting structure, 용접, connection geometry, 재료, 테스트, 검사.
목차
- Design and Construction
- 일반적인 응용 분야
- 유형, Materials and Load Ratings
- How to Select a Weld-On Lifting D-Ring
- Welding and Installation
- 조작, Testing and Traceability
- Inspection and Removal Criteria
- What Buyers Should Compare
- 자주 묻는 질문
- 결론
1. Design and Construction
A Weld-On Lifting D-Ring normally contains the following components:
| 요소 | 기능 |
|---|---|
| Forged lifting ring | Carries the lifting load and connects to shackles, 후크, or slings |
| Weld-on block | Transfers the load into the supporting structure |
| Pivoting connection | Allows movement within the permitted loading direction |
| WLL marking | Identifies the rated working load |
| Traceability marking | Links the product to manufacturing and inspection records |
Manufacturers commonly produce the lifting ring from forged and heat-treated alloy steel. The material and heat treatment determine strength, 인성, deformation resistance, and fatigue performance. 게다가, the weld-on block must provide sufficient mechanical strength while maintaining suitable weldability.
Load Path
이러한 이유로, engineers should evaluate the lifting point as part of the complete load path rather than as an isolated component.
A lifting point may incorrectly applied if:
- The supporting plate is too thin
- The supporting steel has insufficient strength
- The weld size is inadequate
- The weld contains defects
- The lifting point install in the wrong orientation
- The applied load direction is not permitted
- The connected hook or shackle causes point loading
- The load distributed unevenly
그러므로, the lifting point, weld, supporting structure, and rigging arrangement must considered together.
Lifting D-Ring vs. Lashing D-Ring
| Lifting D-Ring | Lashing D-Ring |
|---|---|
| Intended for lifting suspended loads | Intended mainly for cargo restraint |
| Rated by WLL | Commonly rated by lashing capacity |
| Connected to lifting slings, 족쇄, 또는 후크 | Used for cargo securing |
| Designed and tested for lifting applications | May follow different design requirements |
2. 일반적인 응용 분야
실제로, weld-on lifting points are used where equipment requires a fixed lifting connection.
| 산업 | 일반적인 응용 분야 |
|---|---|
| 중장비 | 발전기, 슬리퍼, compressors, machine frames, 스키드 |
| 건설 | 굴삭기, 첨부 파일, earthmoving machinery |
| 채광 | 크러셔, drilling equipment, machinery frames |
| 난바다 쪽으로 부는 & 선박 | Offshore skids, deck equipment, modules, marine machinery |
| Steel Fabrication | Tanks, frames, 리프팅 빔, structural assemblies |
| 운송 | Transport frames and handling equipment |
3. 유형, Materials and Load Ratings
일반적인 유형
| 유형 | 형질 | 애플리케이션 |
|---|---|---|
| Pivoting Weld-On D-Ring | Pivots within one plane and can usually fold down | Machinery and general lifting |
| Multi-Directional Lifting Point | Designed for several specified loading directions | Angular lifting and equipment rotation |
| Heavy-Duty Load Ring | Larger connection area and higher capacity | Heavy fabrication and offshore equipment |
| Spring-Retained Design | Ring remains in position when unloaded | Mobile and vibrating equipment |
| Special-Environment Design | Uses specific materials or surface protection | 선박, 화학적인, or low-temperature service |
Materials and Heat Treatment
The load-bearing ring commonly made from forged and heat-treated alloy steel. The material specification and heat treatment affect:
- 인장강도
- Toughness
- 피로 저항
- Resistance to permanent deformation
- Performance during proof testing
WLL, Proof Load and Breaking Load
| 용어 | 의미 |
|---|---|
| WLL - 작업 부하 제한 | Maximum permitted working load under specified conditions |
| 증명 하중 | Test load applied to verify product integrity |
| 최소 파괴 하중 | Specified minimum load associated with destructive failure |
| 디자인 요소 | Relationship between working capacity and design strength |
4. How to Select a Weld-On Lifting D-Ring
Selection should be based on the lifting arrangement and installation conditions.
| 요인 | 확인해야 할 사항 |
|---|---|
| 짐 무게 | Gross lifting weight |
| Center of Gravity | 부하분배 |
| Number of Lifting Points | Actual load on each point |
| 슬링 각도 | Increase in sling-leg tension |
| Loading Direction | 수직의, angular, side, or multi-directional |
| Supporting Structure | Steel grade, 두께, 보강, weldability |
| Connection Dimensions | Compatibility with shackles, 후크, or slings |
| 환경 | 온도, 부식, marine or chemical exposure |
| 인증 | 테스트, NDT, 추적 성, third-party requirements |
5. Welding and Installation
The weld forms part of the load path and should be treated as a structural connection.
Installation Requirements
| 요구 사항 | Consideration |
|---|---|
| Surface Preparation | Remove paint, 녹, 기름, scale, 그리고 오염 |
| Welding Procedure | Follow product and supporting-steel requirements |
| Weld Size | Meet the specified dimensions |
| Filler Material | Match the weld-on block and parent steel |
| Welder Qualification | Suitable for the process and material |
| Orientation | Match the specified loading direction |
| Clearance | Allow free movement of the lifting ring |
| 점검 | Verify the completed installation |
The welding procedure may also specify:
- Number of weld passes
- Welding sequence
- Preheat
- Interpass temperature
- Cooling requirements
- Inspection method
Load-Bearing Ring
The forged and heat-treated lifting ring should not be subjected to uncontrolled:
- Welding heat
- Heating
- 굽힘
- Reshaping
- Grinding of load-bearing sections
Uncontrolled heating can change the material properties produced during heat treatment.
Welding should be limited to the components designed for welding.
Post-Weld Inspection
응용 프로그램에 따라, inspection may include:
- Visual inspection
- Dimensional inspection
- Magnetic-particle testing
- Dye-penetrant testing
- Other specified NDT methods
The surrounding supporting structure should also be checked where required.
6. 조작, Testing and Traceability
The performance of a lifting point depends on manufacturing controls throughout production.
| Manufacturing Stage | 제어 |
|---|---|
| Raw Material | Material grade and heat/batch traceability |
| 단조 | Geometry and load-bearing sections |
| 열처리 | 힘, 인성, and fatigue properties |
| 가공 | Dimensions and functional fit |
| NDT | Crack and defect detection |
| 증명 테스트 | Verification of load-bearing integrity |
| 마킹 | WLL and traceability |
| 선적 서류 비치 | Inspection and test records |
추적 성
Product identification may include:
- WLL
- 제조업체 식별
- Product designation
- Batch number
- Heat number
- Serial number
- Certificate reference
This allows the product to be linked to its manufacturing records:
Material → Heat Treatment → Inspection → Testing → Certification
Traceability is commonly required for offshore, energy, 채광, and other controlled lifting applications.
7. Inspection and Removal Criteria
Inspection should cover: D-Ring + Weld-On Block + Weld + Supporting Structure
검사항목
| Inspection Item | Concern |
|---|---|
| Cracks | Structural failure |
| Permanent deformation | 과부하 |
| Excessive wear | Reduced load-bearing section |
| 부식 | Material loss |
| Weld damage | Loss of connection strength |
| Restricted movement | Incorrect articulation |
| Heat damage | Change in material properties |
| WLL marking | Product identification |
| Supporting steel | Cracking or deformation |
The lifting point should remove from service when:
- Cracks are found
- Permanent deformation is visible
- Significant material loss has occurred
- Weld damage is present
- Corrosion exceeds the acceptance criteria
- Ring movement is restricted
- Product identification cannot be confirmed
- Unauthorized heating or modification has occurred
A damaged forged lifting ring should not be welded, heated, bent, or reshaped unless an approved repair procedure is available.
Inspection intervals should reflect the frequency of use, 환경, and service conditions.
8. What Buyers Should Compare
Two lifting points with the same WLL are not necessarily equivalent.
| Evaluation Item | What to Compare |
|---|---|
| WLL | Capacity and permitted loading direction |
| 재료 | Steel grade and heat treatment |
| 디자인 요소 | Rating basis |
| 증명 테스트 | Test load and frequency |
| NDT | Inspection method and scope |
| Loading Direction | 수직의, angular, side, or multi-directional |
| 용접 | Installation procedure and weld requirements |
| 추적 성 | Batch or individual identification |
| 환경 | Temperature and corrosion limits |
| 인증 | Standards and third-party requirements |
| 선적 서류 비치 | Drawings, 인증서, and reports |
WLL and price alone do not establish technical equivalence. The product specification should include design, 재료, 테스트, 용접, 점검, 및 추적성 정보.
9. 자주 묻는 질문
1. What does WLL mean on a Weld-On Lifting D-Ring?
WLL means Working Load Limit. It is the maximum working load permitted under the conditions specified by the manufacturer. A WLL 20T marking does not mean that the lifting point can carry 20 tonnes under every loading condition.
2. Can a Weld-On Lifting D-Ring be welded onto any steel plate?
아니요. The supporting steel must have sufficient strength, 두께, 보강, and weldability to transmit the lifting forces.
3. What material is used for Weld-On Lifting D-Rings?
Load-bearing rings commonly manufactured from forged and heat-treated alloy steel. The weld-on block must also provide suitable weldability.
4. Is Grade 80 or Grade 100 필수의?
Not necessarily.For Weld-On Lifting D-Rings, WLL, 재료, 열처리, 디자인 요소, proof load, loading direction, and applicable standards provide more relevant information.
5. Who should install a Weld-On Lifting D-Ring?
Installation need to carry out by a qualified welder using an appropriate welding procedure and the manufacturer’s installation requirements.
6. What information is required when requesting a quotation?
| Information | Typical Requirement |
|---|---|
| 필수 WLL | 5티 / 10티 / 20티, 등. |
| 수량 | Number of lifting points |
| Equipment Weight | Gross lifting weight |
| Loading Direction | 수직의 / angular / multi-directional |
| 슬링 각도 | Where applicable |
| Supporting Steel | Material and plate thickness |
| 연결 하드웨어 | 걸쇠 / 훅 / sling |
| 환경 | Indoor / 선박 / 난바다 쪽으로 부는 |
| 온도 | Minimum and maximum |
| 테스트 | Proof test / NDT |
| 인증 | Project or third-party requirements |
For high-capacity, 난바다 쪽으로 부는, or critical lifting applications, an installation drawing or lifting arrangement drawing should be provided.
10. 결론
A Weld-On Lifting D-Ring transfers lifting forces from the rigging system into the equipment or supporting steel structure.
Its selection should consider: WLL + Loading Direction + Sling Geometry + Supporting Structure + 용접 + 재료 + 테스트 + 인증
Two lifting points with the same WLL may have different materials, loading directions, design factors, testing requirements, welding instructions, or certification. The lifting point should select according to the actual load case and installation conditions rather than by WLL or physical size alone.
NTSC manufactures and supplies lifting and rigging products, including weld-on lifting points, 산업용, 선박, 난바다 쪽으로 부는, 건설, and material-handling applications.



